South Pearl Street Structure Fire
Fuller Hose was dispatched just 4 houses North of the Fire House For a Structure Fire Wednesday February 7,2007. Chief 201 arrived on scene with a 2 story residential structure with nothing showing. Chief 201 meet the home owner out front and he stated that the fire was in the basement. Engine 202 arrived and sent their crew to the basement. Crescent Ladder 209 arrived next and began ventilating. Engine 204 arrived and stretched the booster line into the basement and extinguished the fire. Once the fire was out both Engine crews over hauled the basement and check for extension. The Ladder crew finished ventilating and went available. Both Engines went available shortly there after. Chief 200 had the S Pearl St. Command.